Here is a video showing what things look like:
The next steps will be:
1) installing drain lines in this material which will require digging ditches with the proper slope for good drainage in the pipes.
2) start laying block walls!
Happy Easter!
It is an amazing undertaking that will help the poorest of the poor for generations: a 46,242 square foot Hospital being constructed with funding from almost 500 individuals, families, churches and other generous donors. Solid Rock International passes 100% of donations to the construction and takes 0% of donations for SRI administrative costs, which is extraordinary.